Industrial & flex: the building has to fit the work.
Warehouses, manufacturing buildings, flex space and yards. The right building is the one your operation can legally and physically run in, at a cost the business can carry.
What we check
Each of these can make a building right or wrong for you before price enters the conversation.
Clear height
The usable height under the lowest beam, pipe or light. It decides how high you can rack and whether your equipment fits. Measure it; do not take it from a flyer.
Loading
Dock-high doors for trailers, grade-level doors for vans and forklifts, and enough room in front for a truck to turn. Count the doors and check their size.
Power
Amps, voltage and phase at the panel. Manufacturing and cold storage can need far more than a warehouse has, and a utility upgrade can take many months.
Yard
Fenced and paved area for trucks, trailers, equipment or materials. Check that outdoor storage is actually permitted on the site.
Zoning
What the city or county allows on the parcel. Some uses need a conditional use permit even in an industrial zone. Confirm with the planning department before you sign.
Parking
Stalls for employees and customers, and room for trailers. Cities set minimums by use, so a change of use can change the requirement.
Fire sprinklers
The system type and rating set what you can store and how high. High-piled storage may need a permit and upgrades.
Floor and structure
Slab condition and thickness for heavy loads, roof age, and any mezzanine that was built without permits.
How industrial deals are usually structured
| Term | What it means | Why it matters |
|---|---|---|
| NNN lease | The tenant pays base rent plus property tax, insurance and maintenance. | Most industrial leases. Ask for the last two years of pass-through charges. |
| Modified gross | Some building costs are included in the rent. | Common in smaller multi-tenant parks. |
| Rent per square foot per month | California industrial space is usually quoted monthly. | Compare like with like: a quote may or may not include the NNN charges. |
| Owner-user purchase | The business buys the building it operates in. | Often financed with an SBA loan. See buying a building. |
Diligence for this property type
Phase I assessment
Industrial sites have histories. A Phase I looks at past uses and tells you whether testing is needed. Lenders usually require it.
Zoning and permits
Written confirmation of permitted use, and permits for any improvements, mezzanines or spray booths.
Roof, power and sprinklers
Roof inspection, an electrician's review of the service, and the sprinkler system's rating.
The full list, with the order to do it in, is in the commercial due diligence guide.
Before you ask
What is flex space?
A building that mixes office or showroom in front with warehouse or light manufacturing behind, usually with grade-level loading.
Can I store materials outside?
Only if the zoning and any use permit allow it. This is one of the most common surprises with yards.
How much power do I need?
Your equipment supplier or electrician can tell you. Bring that number to the search, because adding power later is slow and costly.
Lease or buy?
If the operation is stable and the building fits, owning can make sense. We can show both for the same requirement.
Tell us what you need.
Use, size, power, loading and where. A broker reviews what you send and calls you.
Or call 818-696-0888 · hello@sbzcre.com
